Burbank, California

ADU Contractor in Burbank, CA

ADU Construction in Burbank, CA from American Reliable Construction & Remodeling, a licensed general contractor (CSLB #1155602) headquartered on Ventura Boulevard in Sherman Oaks. We design, permit and build the project, with permits handled and one coordinator on site. For a free in-home estimate and a written, itemized quote, call (877) 702-6180.

CSLB #1155602 · Licensed, bonded & insured · BBB Accredited · A- Rating · 5.0 on Google (26 reviews)

ADU Construction project by American Reliable Construction & Remodeling, illustrating our remodeling services

Burbank’s neighborhoods each suggest a different ADU. In Magnolia Park and the Rancho-adjacent flats, 1920s and 1930s bungalows sit on modest lots where a garage conversion or compact detached unit fits the scale of the street. In the Rancho district itself, deep lots — some with equestrian rights and rear alley access — can take a full-size detached backyard unit without crowding the main house. Above Glenoaks in the Verdugo foothills, slope, drainage and hillside review join the conversation.

Most Burbank ADU projects are a detached backyard unit, a conversion of a detached or attached garage, or an attached addition. Which one a lot supports depends on setbacks, the garage condition, where the sewer runs and how the unit will be used — family, long-term rental or a home office with a bathroom. We answer that at a feasibility visit before design starts.

American Reliable Construction & Remodeling designs, permits and builds ADUs across Burbank from our Sherman Oaks office, twelve minutes from Magnolia Park. One project coordinator runs feasibility, design, engineering, City of Burbank plan check and construction under CSLB #1155602. Warranty available. Call for details.

Planning range

Typical investment for a Los Angeles ADU

  • $60,000–$130,000 JADU
  • $90,000–$180,000 garage conversion
  • $180,000–$320,000 attached ADU
  • $250,000–$500,000+ detached ADU

Unit type, size, site conditions, utility runs, engineering and finish level move the price.

Every home is different — your written estimate is itemized after a free in-home visit.

Read the 2026 Los Angeles ADU construction guide
Decisions We Walk You Through
Detached new build or garage conversion?
Rancho-district lots with deep yards and alley access are natural candidates for a detached backyard ADU. On the smaller Magnolia Park lots, converting the existing detached garage is often the better fit — the shell exists, so construction is faster, and state law prevents the city from requiring replacement parking when a garage becomes an ADU.
Size against the yard
A two-bedroom unit around 1,000 square feet works on the deeper Rancho lots; on tighter bungalow lots, a studio or one-bedroom keeps usable yard and distance from neighbors. For family use, accessibility — a no-step entry and a curbless shower — is worth designing in from the start.
Utilities and sewer
The sewer route and depth, the capacity of the main electrical panel and whether the ADU gets its own meter are decided during feasibility, because they shape both the design and the estimate. A detached unit usually needs a new sewer connection or a tie-in to the main house lateral, a subpanel or panel upgrade, and its own water and gas planning.
Family use or rental
State ADU law allows a permitted ADU to be rented long-term; short-term rentals are generally prohibited. A unit designed for a parent or adult child differs from one designed for a tenant — accessibility, sound separation and a private entrance matter more for family, durability and separate metering matter more for rental. We design for the stated use from the start.
Permits & Inspections in Burbank
  • Burbank is its own city — permits are issued by the City of Burbank Community Development Department, Building Division, not LADBS. The city publishes its ADU standards and application process on its own pages, and we design to them.
  • California ADU law applies statewide: qualifying ADUs are approved ministerially — no discretionary hearing — and a complete application must be approved or denied within 60 days. State law guarantees at least an 850-square-foot one-bedroom or 1,000-square-foot two-bedroom ADU with 4-foot side and rear setbacks, and 16-foot height for a detached unit. The California HCD ADU Handbook is the authoritative plain-language reference; local standards still shape design, so we confirm them with the city for every parcel.
  • Lots in the Verdugo foothills can trigger grading and hillside review, and alley-served parcels in the Rancho district have their own access and utility-routing considerations. Both are assessed at feasibility, not discovered at plan check.
  • We prepare the drawings, submit to the City of Burbank, respond to plan-check corrections and schedule every inspection. Requirements change; we confirm them with the city on every project.

Timeline

Feasibility and design take a few weeks; City of Burbank plan check follows and varies with the design and season. A garage conversion is typically the fastest build; a detached new-construction ADU takes several months of construction. You receive a written schedule and a single point of contact from the first visit to the certificate of occupancy.

Customer Reviews

What homeowners say

5.0 · 26 Google reviews
5.0 on Yelp

“We recently completed a room addition along with a full roof customization, and the results are amazing. The team was professional, organized, and easy to communicate with throughout the entire project. The new room looks like it has always been part of the house, and the new roof was installed perfectly. Highly recommend their services!”

Charline
Room Addition & Roofing

“I didn't think a bathroom could make that much of a difference until this one was finished. We kept the design pretty timeless with a walk in shower, porcelain tile, and a wood vanity, and it completely changed the feel of the space. It feels cleaner, more open, and just a lot more enjoyable to use every day.”

Dr White
Bathroom Remodel

“Great experience with American Reliable Construction & Remodeling. They helped us with our ADU from start to finish and made the whole process smooth and stress-free. The team was professional, responsive, and delivered quality work. Highly recommend!”

Ariel
ADU Construction

Planning adu construction in Burbank?

We'll visit the property, answer the permit and layout questions, and put a written, itemized estimate in your hands — free, no obligation.

FAQ

What do Burbank homeowners ask about adu construction?

Don’t see yours? Call (877) 702-6180.

Published 2026 planning ranges are $60,000–$130,000 for a JADU, $90,000–$180,000 for a garage conversion, $180,000–$320,000 for an attached ADU, and $250,000–$500,000+ for a detached ADU. Unit type, site conditions, utility runs and finish level move the price. Every home is different — your written estimate is itemized after a free in-home visit.

Get Started

Request Your Free Burbank Estimate

Tell us about your adu construction project in Burbank. We'll schedule an in-home visit and put a detailed written estimate in your hands — no obligation.

Tell us about your project

Two quick steps. We typically respond within one business day.

About your project
What are you planning?
Timeline (optional)

CSLB #1155602 · Licensed, bonded & insuredPrefer to talk? (877) 702-6180

By submitting this form you agree to be contacted by American Reliable Construction & Remodeling, Inc. about your project by phone or email. SMS opt-in is optional and is never required to receive a quote.