Santa Monica, California

Kitchen Remodeling in Santa Monica, CA

Kitchen Remodeling in Santa Monica, CA from American Reliable Construction & Remodeling, a licensed general contractor (CSLB #1155602) headquartered on Ventura Boulevard in Sherman Oaks. We design, permit and build the project, with permits handled and one coordinator on site. For a free in-home estimate and a written, itemized quote, call (877) 702-6180.

CSLB #1155602 · Licensed, bonded & insured · BBB Accredited · A- Rating · 5.0 on Google (26 reviews)

Kitchen Remodeling project by American Reliable Construction & Remodeling, illustrating our remodeling services

Santa Monica kitchens come in three broad types, and each remodels differently. The 1920s–40s Spanish and Monterey-style homes north of Montana have small, formal kitchens behind thick plaster walls. The post-war bungalows of Sunset Park and Ocean Park have the familiar closed galley on a compact footprint. And the condo and apartment buildings along the Wilshire and Montana corridors add a layer most remodels never see: HOA architectural review, building-management rules for work hours and debris, and shared plumbing and ventilation that constrain what can move where.

American Reliable Construction & Remodeling works in all three. From our Sherman Oaks office we design the layout, specify materials that hold up in a coastal environment — salt air is genuinely hard on hardware, hinges and exterior venting — and manage permitting through the City of Santa Monica Building & Safety Division, including the city’s green-building and water-efficiency requirements.

Condo and multifamily work gets the same design attention as a single-family kitchen, plus the logistics the building demands: certificates of insurance for the HOA, protection of common hallways and elevators, and deliveries and demolition confined to approved windows. We handle that coordination directly with building management so the project does not stall on paperwork after it has started.

American Reliable Construction & Remodeling, Inc. is a licensed California general contractor (CSLB #1155602), bonded, insured and BBB Accredited (A- Rating). Warranty available. Call for details.

Planning range

Typical investment for a Los Angeles kitchen remodel

  • $25,000–$45,000 budget refresh
  • $45,000–$90,000 mid-range remodel
  • $90,000–$200,000+ high-end remodel

Cabinetry, appliances, layout changes, structural work, plumbing and electrical move the price.

Every home is different — your written estimate is itemized after a free in-home visit.

Read the cost guide
Decisions We Walk You Through
Materials that survive the coast
Within a mile of the ocean, standard cabinet hardware, sink bases and exterior vent terminations corrode faster than inland. We specify stainless and coated hardware, marine-grade venting and finishes chosen for the environment — a small premium that avoids premature replacement.
Condo rules shape the design
Many Santa Monica condo buildings restrict wet-over-dry plumbing moves, demolition hours and debris routes. We review your HOA’s CC&Rs and building rules at the estimate stage so the design is approvable before money is spent on drawings.
Opening a bungalow kitchen
In Sunset Park and Ocean Park bungalows, removing the wall to the dining room is the highest-impact change. We determine whether the wall is bearing at the first visit and price the beam and permit path into the estimate.
Storage where square footage is scarce
Santa Monica kitchens are among the smallest we work in. Full-height cabinetry, pull-out pantries and integrated appliances routinely recover meaningful storage without adding a square foot.
Permits & Inspections in Santa Monica
  • Santa Monica is its own city — permits are issued by the City of Santa Monica Building & Safety Division, not LADBS.
  • Structural changes, plumbing moves and new electrical circuits require permits and inspections; the city also applies local green-building and water-efficiency standards to many remodels.
  • Properties in the Coastal Zone may require additional review; we confirm applicability before finalizing the design.
  • Condo projects typically need HOA approval before the city submittal; we prepare the drawings and material documentation both require.

Timeline

Design and selections typically take a few weeks; City of Santa Monica plan check — plus HOA review for condos — adds time before construction. Once demolition starts, most Santa Monica kitchens take one to two months, with building work windows shaping the daily schedule in multifamily properties and cabinetry lead times setting the critical path. We order long-lead items before demolition and give you a written, week-by-week schedule before we begin.

Customer Reviews

What homeowners say

5.0 · 26 Google reviews
5.0 on Yelp

“We finally redid the kitchen after years of just working around it. The old cabinets were particle board and starting to fall apart, so we switched to solid plywood boxes with soft close hardware. They paired that with quartz countertops…”

Ashley
Kitchen Remodel

“We recently completed a room addition along with a full roof customization, and the results are amazing. The team was professional, organized, and easy to communicate with throughout the entire project. The new room looks like it has always been part of the house, and the new roof was installed perfectly. Highly recommend their services!”

Charline
Room Addition & Roofing

“I didn't think a bathroom could make that much of a difference until this one was finished. We kept the design pretty timeless with a walk in shower, porcelain tile, and a wood vanity, and it completely changed the feel of the space. It feels cleaner, more open, and just a lot more enjoyable to use every day.”

Dr White
Bathroom Remodel

Planning kitchen remodeling in Santa Monica?

We'll visit the property, answer the permit and layout questions, and put a written, itemized estimate in your hands — free, no obligation.

FAQ

What do Santa Monica homeowners ask about kitchen remodeling?

Don’t see yours? Call (877) 702-6180.

Published 2026 planning ranges are $25,000–$45,000 for a budget refresh, $45,000–$90,000 for a mid-range remodel, and $90,000–$200,000+ for a high-end project. Cabinetry, appliances, layout changes, structural work, plumbing and electrical move the price. Every home is different — your written estimate is itemized after a free in-home visit.

Get Started

Request Your Free Santa Monica Estimate

Tell us about your kitchen remodeling project in Santa Monica. We'll schedule an in-home visit and put a detailed written estimate in your hands — no obligation.

Tell us about your project

Two quick steps. We typically respond within one business day.

About your project
What are you planning?
Timeline (optional)

CSLB #1155602 · Licensed, bonded & insuredPrefer to talk? (877) 702-6180

By submitting this form you agree to be contacted by American Reliable Construction & Remodeling, Inc. about your project by phone or email. SMS opt-in is optional and is never required to receive a quote.